red christmas ballExit rate. Exit rate. Exit rate.

Exit rate is one of the measurements of the growth of an oil company.

This post is brought to you by Proven Reserves Exploitation Ltd., one of our information sponsors. Check out the related infographic 10 ways to increase production before Christmas - infographic

Investment is starting to flow into the oil patch. Every employee is busy looking for opportunities.

However, like year-end tax planning, it's difficult to make a big difference in a short amount of time.

Need to get your exit rate up?
?subject=Help me get my exit rate up quickly&body=Help me get my exit rate up quickly. Let's discuss ways to increase production by year end.%0D%0A%0D%0AMy name __________%0D%0AMy phone __________%0D%0AOr call Proven at 403 803 2500">Contact Proven for help in making more oil quicker.

But here's 10 ways to make a quick difference to your exit rate. Each idea costs less than half a million.

1. Shoot fluid levels

Shooting fluid levels will quickly tell you where you can make more oil. If the fluid level in an oil well is more than 1 joint, you can likely speed up the pump.

This may seem obvious, but I'm surprised how many fields I look at where the fluid levels haven't been shot for years. There is no database of fluid levels for the wells. When I check with the operations staff, they didn't know it was important.

Cost: $0.5-$1k per well

2. Run dynamometers

Among other things, a dynamometer can tell you if a downhole pump is worn. A worn pump doesn't work efficiently produces less oil than the well capacity. I've seen wells where the pumps have been worn for three years that saw an instant productivity increase after a pump change.

Cost: $1-$2k per well

Need a check up for your bottom hole pump?
?subject=Help me determine where to run dynamometers&body=Help me determine where to run dynamometers. Let's get my bottom hole pumps working at their peak performance.%0D%0A%0D%0AMy name _________%0D%0AMy phone _________%0D%0A%0D%0AOr contact Proven at 403 803 2500.">Contact Proven to learn about the benefits of dynamometers.

3. Speed up pumps

If your bottom hole pumps are in good shape and you've got fluid above the perfs, you might be able to speed up the pump stroke.

For example, increasing the pump speed from 4 strokes per minute to 5 adds 20% more production.

Cost: Free

4. Replace downhole pumps

Worn bottom hole pumps can reduce your production. If one of your oil wells hasn't had a pump change for more than a year, you might be able to make more oil by changing the pump.

Especially if an oil well has its pump stroke set "on-tap" the bottom hole pump is likely to be worn. Check it and change it.

Check the biggest wells first. If you can add 20% more production for the big wells your overall production will improve significantly.

Cost: $5-$15k per well

5. Well restarts

Look for wells that were suspended over the last few years. Can they be restarted?

You would be surprised how many wells have been suspended because the rods broke and no one thought there was money for a rod job.

I once found a well for a client that had been suspended for 4 years. Its previous production rate had been 150 bopd. We repaired the rods and put the well back on production. The one well made our client get a bonus for the year.

Cost: Free

6. Shut in the gassiest oil wells

If one well in your oil pool is very gassy, consider shutting it in. The rest of the oil wells may flow better.

You may find that all the gas that one gassy well was introducing into the gathering system was creating a high pressure drop and putting back pressure on the rest of the oil wells.

In addition to creating gathering system back pressure problems, producing a lot of gas from the pool is likely depleting the pressure in the pool prematurely. Shutting in the gassy well will save the reservoir pressure and help the others flow better. This will be a great long term affect from shutting in the gassy well.

Cost: Free

Reduce backpressure on your oil wells by reducing gas in your gathering system.
?subject=Help me reduce back pressure in my gathering system&body=Help me review the gas in my gathering system so I can reduce back pressure on my wells. Tell me how much more oil I'll make.%0D%0A%0D%0AMy name _______%0D%0AMy phone _______%0D%0A%0D%0AOr call Proven at 403 803 2500.">Contact Proven for analysis of how much extra production your make.

7. Drop the back-pressure

A well can only flow against the pressure on the well head. The higher the well head pressure, the lower the well flow.

Conduct a pressure audit along the gathering system. If there any big pressure drops, eliminate them. You'll increase productivity.

Cost: $0.5-$1k

8. Rent a compressor

This is one way to improve production especially on gas wells. If you can drop the back pressure on a well by installing a rental well head compressor, you can sometimes increase the production by 50%.

Since gas prices have been down for so long, there are many rental compressors available.

Conduct a back pressure test first to determine how much additional production you'll make.

Although this is a gas tip, it can also work for oil wells.

Cost: $15-$25k per month

9. Perf uphole zones in suspended wells

Can you perf uphole in any of the suspended wells?

Some of your suspended wells may not be restart candidates. But you might have an uphole gas zone. For the cost of a plug and a perforation, you might be able to add reserves and production quickly.

Cost: $30-$40k

10. MRL audit

This isn't a field tip -- it's a regulatory tip. If you have wells still choked by maximum rate limitation, you can likely get the restriction lifted with an application.

As of last week, good production practice applications are being approved in less than a month. If you hurry, you might get one approved before year end.

MRL Audit Cost: $10-$20k

We were successful in getting GPP for one operator even though his DIY application had failed the first time. At Proven, we know how to read between the lines. We know what the regulator needs to hear to grant an approval. And we have a money back guarantee. To see that application, click on the blue button below labelled "Get this application now".

  Get details of this cool tech   Subscribers get them for free

Get GPP for ALL your wells.
?subject=Help me get GPP for all my wells&body=Help me get GPP for all my wells. Let me leverage your GPP know-how to increase production by year end.%0D%0A%0D%0AMy name _______%0D%0AMy phone _______%0D%0A%0D%0AOr call Proven at 403 803 2500.">Contact Proven for an MRL audit.

And one more flow assurance tip for good measure -- Reperf

How can you tell if the perfs in your well are still open? Scale, wax, asphaltenes or even a poor original perforating job might be blocking the perfs.

If a well isn't performing as well as you think it ought, reperforate it. Maybe you'll get more production.

Cost: $10-$20k


We've given you 10 ways to increase production before Christmas -- and one bonus. If you're too busy to get these done, call Proven. We can help you get your production up before end of year.

Tags: Tight, Polymer, Flood, Heavy Oil

Granger Low   Updated 20 Nov 2025



Celebrating 2025, a year of innovation

Oil and gas paradigm shifts this year

Check out the x-section and net pay map

AppIntel AI shows you opinions of offsetting acreage

RTF: Most refused submission type in November

Leading indicators from industry

Supercharge 2026 with exploration AI skills that matter

Found a corner shot in thermal scheme

Don't blow the lid

Fracking into a neighboring well causes a blowout

Continuing Canadian thermal innovation doubled oil production

Experimental Propane Solvent co-injection in thermal

Shale in SAGD

How shale much is too much shale? Ask AppIntel AI.

Measuring the rate of oil and gas technology growth

Energy transition inside the oil industry

The rise of water recycle

Join or perish

AppIntel AI shows SAGD type logs

Check out the picks and cap rock

AppIntel AI hit alerts

Ignite your insight

Blowdown and NCG injection

SIRs often reveal more than submissions

AppIntel AI contains much more than technical papers

More current. More coverage. More detail. More trusted.

AI provides access to regional seismic mapping

Find it with AppIntel AI

New flood to double reserves for heavy oil pool

The age of water floods is not over

AppIntel AI finds three corner shots

Can you see them?

Flood repatterning

Extended life support

AppIntel AI shows maps of neighbor's complex geology

In a flood of a commingled pool

AI makes opportunity more accessible than conferences

Which sources of technical information do you trust?

Repairing microannulus in thermal wells

Check out the 4D seismic chamber thickness map

In-house AI attempts fail-80%

Spin off your in-house AI attempt

AppIntel AI provides processed seismic

How else would you find this?

Facility fugitive emissions scrutiny

Keep your eye on the horizon of oil and gas change

AI predicts the future for 2026

using leading indicators

This page last updated 27 February 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share